Facts, with sources
What’s real today
Before any dream, the facts. Every line names the document it came from.
This is what exists today, from documents. Checked October 3, 2026 (CT). Not a proposal.
The pedestrian swing bridge is on hold as of Nov 2, 2026: City Hall recommends pausing its design and engineering (WHBL).
How these pages work
- Only lines marked documented in our research appear here, each checked against city records.
- Every fact shows its source file name and line number, and a link to the primary document when there is one.
- If a document does not answer a question, the page says Unresolved instead of guessing.
- Nothing here is a proposal. The vision pages are proposals and say so at the top.
Pick a topic
18 sourced lines
Lakefront and marina
The adopted marina plan, the money lines, the bridge design, and the dates ahead.
25 sourced linesTransit and downtown
How Shoreline Metro runs today, and a few downtown sites.
19 sourced linesSite restrictions
Ownership, zoning and flood mapping for the sites in the vision.
6 sourced linesOpen city-owned sites
City-owned lots that are open today.
3 sourced linesProjects waiting
Documented schedules and next steps for a few projects.